LADWP + LADBS, in the right order
LADWP owns the meter and the service up to it. LADBS issues the permit and inspects. For a panel upgrade:
- Load calculation and plan
- Free LADWP meter spot: an ESR visits within 5–15 business days and leaves a sketch the inspector may ask for
- LADBS Express Permit (no plan review) via PermitLA
- Install, LADBS inspection, then LADWP sign-off and reconnection
Cost guide: Panel Upgrade Cost in LA
Looking for EV charger rebates after the federal tax credit ended? Our Los Angeles guide to EV charger tax credits and rebates still open covers PWP, SCE, LADWP and BWP programs.






