Title 24 for New Homes 2026: EV, Solar & Battery-Ready
6 min read

Building a new home or ADU in Pasadena or anywhere in LA County? The electrical plan has to meet California's 2025 Energy Code (Title 24, Part 6) and the 2025 CALGreen code, which apply to permit applications filed on or after January 1, 2026. For a new single-family home, that means a garage that's ready for an EV charger, a solar system sized by formula, a main panel ready for a future battery, and heat pumps as the starting point for heating and hot water. These are far easier to build in while the walls are open, so here's what the rules require as of November 2026. Planning a new build or ADU? Talk to us about your electrical plan or call 747-255-8595.
Which Projects Fall Under the 2025 Energy Code
The rule follows the permit date. If your building permit application is filed on or after January 1, 2026, the 2025 Energy Code applies. The requirements in this post cover newly constructed single-family homes, duplexes and new ADUs. They don't apply to additions or alterations to an existing house.
Pasadena adopted the 2025 codes with local amendments (Ordinance 7461), effective January 1, 2026. Pasadena's all-electric ordinance never applied to single-family homes or ADUs, and the City suspended enforcement of it in August 2025. Gas is still allowed in a new house, but it triggers the "electric-ready" rules below.
EV-Capable Garage: What CALGreen Requires
For a new one- or two-family home or townhouse with an attached private garage, CALGreen section 4.106.4.1 requires each dwelling unit to be "EV capable":
- A listed raceway (conduit) at least 1 inch in size, running from the main panel or a subpanel to a box near where the EV charger will go.
- Panel capacity for a 40-amp, 208/240-volt dedicated circuit, plus reserved breaker space.
- The breaker space and the raceway end both marked "EV CAPABLE."
The raceway isn't required if a 40-amp, 208/240-volt dedicated EV circuit is installed near the charger location during construction. See our EV charger installation page for what goes into the charger itself.
Solar PV: Required, but Sized by Formula
New single-family homes still need a solar PV system under section 150.1(c)14. The minimum size is the smaller of two numbers: usable sunny roof area times 18 watts per square foot (14 on a low-slope roof), or a formula based on climate zone, floor area and number of units. No PV is required if the usable roof area is under 80 contiguous square feet, or if the formula comes out under 1.8 kW.
Pairing the PV with a qualifying battery of at least 7.5 kWh can reduce the formula-based solar size by 25%. We don't install solar panels, but we do the electrical side: the service, the main panel, the battery and the wiring your solar installer connects to.
Battery-Ready Panels: The 225-Amp Busbar Rule
This is the requirement that changes panel selection the most. Under section 150.0(s), a new one- or two-unit home whose utility service is larger than 125 amps must be battery energy storage system (BESS) ready unless a battery is installed. That means:
- Either BESS-ready interconnection equipment with at least 60 amps of backed-up capacity and four backed-up branch circuits, or a dedicated 1-inch raceway from the main service to a subpanel for backed-up loads.
- At least four backed-up circuits, covering the refrigerator, lighting near the main exit and a bedroom receptacle.
- A main panel with a busbar rated at least 225 amps.
- Space reserved within 3 feet of the main panel for a future transfer switch.
A 200-amp panel only works if its label shows a 225-amp busbar rating; smart panels can qualify. A new ADU must meet the rule too, unless its electric service is 125 amps or less. If you install a battery during construction, such as a Tesla Powerwall, the BESS-ready rule doesn't apply. As a Tesla Energy Certified installer, we can plan the panel around a battery now or later.
Heat Pumps and Electric-Ready Circuits
The 2025 code makes heat pumps the prescriptive baseline for both space heating and water heating in new homes. The performance path still allows other designs.
If you do install gas, sections 150.0(n), (t), (u) and (v) require wiring for a future electric switch:
- Gas furnace: a 240V circuit with at least 30-amp conductors within 3 feet of the furnace, plus a reserved double-pole breaker space.
- Gas cooktop: a 240V circuit with at least 50-amp conductors within 3 feet of the cooktop, plus reserved space.
- Gas dryer: a 240V circuit with at least 30-amp conductors within 3 feet of the dryer location, plus reserved space.
- Gas water heater: a designated space for a future heat pump water heater with a 120V/240V, 30-amp branch circuit, a 20-amp receptacle and a condensate drain.
Add the EV circuit and battery-ready space, and a new panel fills up fast, so we run the load calculation and lay out the panel before rough-in. Our new construction electrical page covers the full scope.
Pasadena Service Steps: PWP and the Permit Center
In Pasadena, Pasadena Water and Power (PWP) supplies the service and the City's Permit Center at 175 N. Garfield Ave. (626-744-4200) issues the electrical permit. For a new service, PWP's steps are: schedule a meter spot with Electric Service Planning (626-744-4495), get PWP's quote, pull the City permit, pay PWP, open a service account for each meter, then pass PWP's panel and conduit inspection and the City final. PWP then energizes small residential jobs within 14 business days. Any new service over 200 amps single-phase needs room for a City-owned transformer on your property (relevant for a 400-amp home).
Two rebate notes: PWP's $1,000 panel upgrade rebate excludes new construction. PWP's battery rebate ($350/kWh for systems installed on or after January 1, 2026) doesn't list new construction as excluded, so confirm with PWP before you count on it. Our Pasadena ADU electrical guide covers the ADU side.
Rebuilding after the Eaton Fire? Under the Governor's executive order, homes lost in the January 2025 fires don't need solar or batteries but must still be solar-ready. See our Altadena rebuild and panel upgrade guide.
Frequently Asked Questions
When did the 2025 Title 24 Energy Code take effect?
It applies to building permit applications filed on or after January 1, 2026.
Does a new home in California need an EV charger?
No. A new home with an attached garage must be EV capable: a 1-inch raceway, panel capacity and reserved breaker space for a 40-amp, 208/240-volt circuit.
Is a 200-amp panel enough for battery-ready rules?
Only if its busbar is rated at least 225 amps and marked on the label, or if a battery is installed during construction.
Do battery-ready rules apply to a new ADU?
Yes, if the ADU's utility service is larger than 125 amps.
Can I still use gas in a new Pasadena home?
Yes. Pasadena's all-electric ordinance exempts single-family homes and ADUs (and is suspended), but gas appliances trigger electric-ready circuits.
Building New in Pasadena? Plan the Electrical First
911 Construction & Electric Inc. is a licensed, bonded and insured C-10 electrical contractor (CA Lic. #1027421) at 1308 E Colorado Blvd Ste 141, Pasadena, CA 91106, serving Pasadena, Altadena, Glendale, Burbank, Arcadia, the San Gabriel Valley and greater Los Angeles. We also hold a Class B general building license under the same number, and as an electrician in Pasadena we lay out new-home and ADU panels, EV circuits and battery-ready wiring to the 2025 codes, then pull the permit and coordinate with PWP or SCE. Request a free estimate, call 747-255-8595 or visit https://911electrics.com/. 24/7 emergency service available.
Was this helpful?
Keep Reading

6 min read
Arcadia Electrical Permits: Panels, EV Chargers & Rewires
Arcadia runs its own permit office, but it doesn't run its own electric utility. That split shapes every panel upgrade, EV charger and rewire in town. The City of Arcadia's Buil…
Read article →
6 min read
Sierra Madre Panel Upgrades: SCE Charge Ready Home Rules
Thinking about a panel upgrade in Sierra Madre? Two agencies shape the job, and getting them in the right order saves weeks. Sierra Madre is its own city on Southern California…
Read article →
6 min read
Commercial Panel Upgrades in Pasadena & LA: Steps & Costs
Your business is adding a kitchen line, EV chargers or new HVAC, and the panel is maxed out. A commercial panel upgrade can be a simple panelboard swap or a full service upgrade…
Read article →Have an electrical project in mind?
Talk to a licensed electrician today — free estimates, 24/7 emergency service.