Commercial Panel Upgrades in Pasadena & LA: Steps & Costs
6 min read

Your business is adding a kitchen line, EV chargers or new HVAC, and the panel is maxed out. A commercial panel upgrade can be a simple panelboard swap or a full service upgrade with a new switchboard and a utility transformer, and that difference decides your timeline and budget. Pasadena is on Pasadena Water and Power (PWP), most neighboring cities are on Southern California Edison (SCE), and the City of Los Angeles is on LADWP. Here are each utility's steps as of November 2026, and what drives the cost. Want a load calculation on your building first? Contact our commercial electricians or call 747-255-8595.
Panel Swap or Service Upgrade? Know Which One You Need
Two very different jobs go by the same name:
- Panelboard replacement or added panel. The service size stays the same. You replace an obsolete panelboard or add a subpanel. It's a permit and inspection job, usually without utility design work.
- Service upgrade. The building needs more amps, a different voltage, or three-phase power. That means new service equipment (often a switchboard), a meter spot, utility engineering and sometimes a new transformer.
Common triggers: a restaurant adding cooking and refrigeration, an office going all-electric, EV charging for staff or fleet, a main breaker that trips on hot afternoons, or an old switchboard with no spaces left or flagged by an insurer.
Start With a Load Calculation, Not a Bigger Panel
A load calculation under California Electrical Code Article 220 shows what the building uses and what the new equipment adds. For an existing building, 220.87 allows using 12 months of measured peak demand, which can show more spare capacity than a nameplate tally.
The calculation also feeds the single-line diagram and load schedule every utility asks for. Sometimes it shows you don't need a bigger service at all, and SCE itself tells customers to consider load management or efficient equipment before upsizing. Our 400-amp service upgrade guide covers that sizing trade-off.
Pasadena Commercial Panel Upgrades: The PWP Steps
Pasadena businesses are on PWP, not SCE. PWP's posted steps:
- Request a meter spot from PWP Electric Service Planning (626-744-4495, ESP@cityofpasadena.net) and fill out its questionnaire.
- Get PWP's approved meter spot and its quote for the service work.
- Pull the electrical permit from the City of Pasadena Permit Center (175 N. Garfield Ave., 626-744-4200).
- Pay PWP by check at 1055 E. Colorado Blvd., Suite 350.
- Schedule PWP to unlock the meter. Only PWP can do it, and a tampering fee starts at $300.
- Do the work, pass PWP's inspection and the City's final, and PWP turns on the service.
PWP's posted target is to energize all commercial jobs within 21 business days after every clearance is in. The rule that catches businesses off guard: any new or upgraded service over 200 amps single-phase or over 100 amps three-phase needs provisions for a City-owned transformer on your property. That can affect your electrical room layout, so find out early. Projects that need a new primary service also need stamped load calculations, a single-line diagram, switchboard elevations and a pre-construction meeting with PWP.
As a commercial electrician in Pasadena, we pull these permits under our C-10 license and hold the Pasadena business license the City requires. If the upgrade is part of a buildout, see our Pasadena tenant improvement guide.
SCE Cities: Arcadia, Alhambra, South Pasadena and More
Arcadia, Alhambra, South Pasadena, Monrovia, San Gabriel and most other San Gabriel Valley cities are on SCE, with permits from each city's building department. SCE takes commercial requests, including a "panel upgrade (or meter spot) for an existing service connection," through its online Building, Renovation and Project Planning Portal.
The request gets a Service Request number and an assigned SCE representative. SCE reviews documents, visits the site and designs the job. You pay any charges and get permits, the city inspects the meter panel, and SCE sets the meter and energizes. SCE lists an average energization timeline of 125 business days for its line and service extension projects, counting only the SCE-controlled steps, and says service upgrade timelines vary by site conditions.
Not sure the grid near your site has capacity? SCE offers an optional Preliminary Capacity Assessment report ($3,000, nonrefundable, typically 20 to 30 business days). Small businesses with 25 or fewer employees that are electrifying may also qualify for SCE's Common Facility Cost Treatment pilot, up to $10,000 toward utility-side costs. Eligibility is strict, so confirm current terms with SCE.
City of Los Angeles Businesses: LADWP and LADBS
In the City of LA, LADWP serves the power and LADBS issues the permit. LADWP sorts commercial jobs by size:
- Up to 400 amps, single-phase: email your LADWP Electric Service Representative (ESR) a site plan, single-line diagram, load schedule and Service Planning Information Form.
- Over 400 amps or any three-phase service: submit through LADWP's Construction and Renovation electric service request process.
LADWP calculates the available fault current from your plans, and the new equipment must be rated for it. LADBS Information Bulletin P/GI 2026-003 lists non-engineered electrical work under 600 volts and up to 400 amps total load in existing office and retail buildings as an Express Permit with no plan check. Bigger or engineered services need plan review. Once LADBS approves the work, LADWP says the meter generally goes in within 10 working days if no other LADWP work is needed. For the residential version of this sequence, see our LADWP panel upgrade steps.
What Drives the Cost of a Commercial Panel Upgrade
There's no honest flat price for a commercial panel upgrade. These are what move the number:
- Amperage, voltage and phase. A 208Y/120V three-phase switchboard and a 480Y/277V service with step-down transformers are very different scopes.
- Utility-side work. LADWP says upgrades on an adequate existing service generally carry no installation charges, but transformer work, conduit in public property, line work or street resurfacing can add charges. PWP quotes its service work and requires payment before energizing.
- Transformer provisions. In Pasadena, more than 200 amps single-phase or 100 amps three-phase means planning for a City-owned transformer on site.
- Engineering and plans. Stamped load calculations, single-line diagrams and plan check add time and design cost on larger services.
- Downtime. Most service changes need a planned shutdown, and the utility sets the date for its side.
Get an itemized quote and the utility's written estimate before you commit. For same-size replacements, see our panel upgrade service.
Frequently Asked Questions
Does a commercial panel upgrade need utility approval?
Only if the service changes. A same-size panelboard swap needs a permit and inspection. A bigger service, new voltage or three-phase goes through PWP, SCE or LADWP service planning.
How long does PWP take to energize a commercial service upgrade in Pasadena?
PWP's posted target is within 21 business days for all commercial jobs, after every inspection and clearance is complete. Design and permit time come first.
Does a commercial panel upgrade in Los Angeles need plan check?
Not always. LADBS lists non-engineered electrical work up to 400 amps total load in existing office and retail buildings as an Express Permit. Larger or engineered services go through plan review.
How much does a commercial panel upgrade cost?
It depends on service size, voltage and phase, utility-side work, transformer provisions, engineering and shutdown planning. We give a number after a load calculation and site visit.
Can load management avoid a commercial service upgrade?
Sometimes. A load calculation using 12 months of measured demand may show spare capacity, and SCE asks customers to consider load management before upsizing.
Planning a Commercial Panel Upgrade? Talk to a Licensed C-10 First
911 Construction & Electric Inc. is a licensed, bonded and insured C-10 electrical contractor (CA Lic. #1027421) at 1308 E Colorado Blvd Ste 141, Pasadena, CA 91106, serving Pasadena, Altadena, Glendale, Burbank, Arcadia, the San Gabriel Valley and greater Los Angeles. We handle commercial electrical work for businesses in Pasadena and across LA, from load calculations and utility service requests to panel and switchboard upgrades, permits and final inspection. Request a free estimate, call 747-255-8595 or visit https://911electrics.com. 24/7 emergency service available.
Was this helpful?
Keep Reading

5 min read
Temporary Power for Altadena Rebuilds: SCE & County Steps
Most Altadena rebuilds can't start framing until there's power on the lot, and that means a temporary power pole. Altadena is unincorporated LA County on Southern California Edi…
Read article →
6 min read
LADWP Panel Upgrade Steps: From Service Planning to Power
Most of the City of Los Angeles gets its power from the Los Angeles Department of Water and Power (LADWP), and that changes how a panel upgrade works in neighborhoods like Eagle…
Read article →
6 min read
Pasadena Tenant Improvement Electrical: Permits & Timeline
Signing a lease in Pasadena is the easy part. The electrical work for a tenant improvement (TI) is where schedules slip: new circuits for equipment, a lighting layout that has t…
Read article →Have an electrical project in mind?
Talk to a licensed electrician today — free estimates, 24/7 emergency service.